Furniture spec sheets, CAD and 3D files
MadeHallThe short answer
When are furniture spec sheets, CAD and 3D files available?
Availability depends on the selected product and project stage. A spec sheet records the approved product, while planning blocks support layouts. Production-level CAD or 3D information may require a confirmed order and deposit. Ask for the exact file, intended use, product configuration and current revision.
Furniture spec sheets, planning blocks, CAD and 3D files support different decisions, from room layout through production coordination, and should use controlled revisions. MadeHall offers a free space plan in 3 business days, with quantity pricing from 2 units. Delivery and installation are available in select areas — confirm by ZIP code.

What does a furniture spec sheet contain?
A spec sheet records the selected SKU, dimensions, finish, orientation, components and project assignment. It supports approval, purchasing, receiving and reordering. The document should match the current quotation and plan.
Request the selected product rather than a similar family member. If information remains open, mark it clearly and update the revision when the decision is resolved.
What are planning blocks used for?
Planning blocks represent furniture footprints in a room layout. They help test placement, circulation and relationships between items. A planning block may omit production details and should not be treated as a fabrication drawing.
Check the block dimensions and orientation against the selected configuration. Keep a label that ties every block to the furniture schedule.

When are CAD or 3D files needed?
CAD and 3D files can support design coordination, visualization or technical review when the file exists for the selected product and stage. State the software format and intended use. Production-level information may be released only after the purchase order and deposit are confirmed.
Do not edit a supplier file and treat the result as an approved product change. Mark requested changes separately for review.
How should file revisions be managed?
Use clear filenames, dates or revision labels and identify the governing version. Link files to the current SKU list and plan. When a product changes, replace or annotate the affected block and specification together.
Browse desks and workstations, use the team workspace page, and send coordinated requests through custom projects.

The room and access facts, written approvals, pre-delivery checks and post-order records that apply to every furniture order are covered in What an office furniture quote should include.